CONCRETE PUMPING

Dependable Pump Truck Service for Northeast Ohio Jobsites

We Offer Pump Truck Rentals

We offer a range of services with our concrete pump trucks. Our pump truck fleet includes three reliable sizes—38-meter, 37-meter, and 33-meter—to provide the flexibility and reach necessary for any concrete job.

Construction site with a concrete pump truck pouring concrete, workers laying foundations, and an excavated area with building frames, trees, and cloudy sky in the background.
Concrete pump truck with a white cab, black and orange flame-like graphics, and large white concrete pumping pipes on a paved surface.

Concrete Pumping Services

*Please inquire for hourly pricing and note all jobs will be bid out on an individual basis.

- If a site is not provided for clean out, and it takes place off site, it will be at the discretion of the driver to pre-determine the time involved and charge accordingly.

- Confirmation of pump placement is required by 1:00 P.M. the day prior to your scheduled pour

- Late cancellation (After a pump truck has left the yard,) will be subject to a $400.00 cancellation charge

- Minimum 4-hour for concrete pump

- Overtime rate is in effect before 7:00 A.M. and after 3:30 P.M.

- $50 per hour for 1st and 2nd hour and $100 for 3rd and additional hours.

- 2 Set ups are included, additional set up charge $100.00

Advantages of pumping concrete:

  • Faster placement of concrete over conventional methods (up to 1-1/2 yards per minute)

  • Can reduce man power needed for placement for larger flat work jobs

  • Because of potential speed of placement, you can reduce or avoid pour lines and cold joints

  • When using a pump truck to place your concrete, it is not necessary to add as much water; this helps to avoid shrinkage cracks and loss of strength

  • Pump trucks also help to reduce the amount of site traffic, which can help reduce the amount of mud and debris tracked into the road

Workers and construction equipment, including a cement mixer truck and a large concrete pump, are on a residential construction site. The workers are handling a large concrete pipe.